top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Parapet Wall Structural Tie Installation & Grout Packing – Lincoln (2024)

Project type

Sector: Residential / Heritage

Date

2024

Location

Lincoln

Project Details:
Location: Lincoln
Year: 2024
Sector: Residential / Heritage

Scope: Structural parapet stabilisation
Scope of Works:
Investigation and preparation of parapet wall masonry
Installation of steel structural tie plate
Mechanical fixing through existing masonry
Grout packing behind steel plate to achieve full contact
Sealing and making good to surrounding masonry finishes

Outcome:
The parapet wall was successfully stabilised, with structural continuity restored between wall sections. The installation of the steel tie and grout packing eliminated movement, improved load distribution, and ensured the long-term safety and performance of the parapet structure.




Description:
Structural stabilisation works were undertaken to a parapet wall in Lincoln, addressing movement and separation identified between adjoining masonry elements. The project focused on improving the structural integrity of the parapet by installing a steel structural tie and fully grout-packing the voids behind the steel plate to ensure effective load transfer and long-term stability.

The works involved careful preparation of the existing masonry, installation of a purpose-fabricated steel plate fixed through the parapet wall, and controlled grout injection behind the plate to eliminate voids and ensure full bearing. All interfaces were sealed and made good to integrate with the existing structure while maintaining durability and weather resistance.

bottom of page